How Long Does It Take to Replace Siding on a House in Kansas City?

Replacing your home’s siding can dramatically improve curb appeal, insulation, and protection from the elements. If you’re planning to replace your siding in Kansas City, Missouri, you’re likely wondering how long the project will take and what it typically entails. The team at Kent Mohler Exteriors explains the factors that influence siding installation timelines, how many days siding installation usually takes, and what to expect during the process.

How Long Does Siding Installation Take?

How long it takes to replace the siding on a house depends on the project’s scale and scope. There are multiple phases in a siding replacement project, with planning, product selection, permitting, and procurement usually taking between one and three weeks.

Generally, the actual siding replacement process takes one to two weeks, but it can stretch into several weeks for larger or more complex projects. For standard siding installations on average-sized homes, you can typically expect:

  1. 1-3 days to remove the existing siding and prepare the surface
  2. 1-4 days for inspections and any necessary repairs to address water damage, pest infestations, or rot
  3. 1-2 days to install weather barriers, house wraps, or insulation
  4. 3-7 days to measure, cut, and install the new siding
  5. 1-2 days for caulking, adding trim, painting, and hauling away debris

Your contractor may also take extra time to conduct a final inspection and walkthrough to ensure you’re happy with the results. However, every house is unique, and several factors can affect these timelines.

Factors That Influence the Siding Replacement Timeline

Siding project timelines vary depending on the home’s square footage, the number of panels being installed, the condition of the structure, and your siding company’s availability. Smaller homes in good condition will naturally have a shorter timeframe, while larger homes or properties with structural damage may require additional preparation and considerations.

When determining the timeline for a siding replacement, technicians will account for the following:

  • The size of the home
  • The number of stories
  • Complex rooflines, dormers, or siding junctions
  • Intricate architecture
  • The chosen siding material
  • The extent of any repairs

In addition, poor weather conditions can cause delays, as technicians cannot safely install siding in rain, extreme cold, or high winds.

Differences in Siding Materials

The type of siding material you select for your project can also affect the installation timeline.

Vinyl Siding

Vinyl is an excellent budget-friendly siding option that enhances energy efficiency and won’t crack, peel, or rot. It is typically the fastest to install because it is lightweight, can be cut with standard tools, and the panels lock together quickly and easily. However, the panels can become fragile and more difficult to cut in cold weather, which can extend the timeline if you choose to replace your siding in the winter.

Seamless Steel Siding

Seamless steel offers a sleek aesthetic and outstanding durability, resisting warping and fading. This material is usually manufactured on-site, and technicians need to set up specialized equipment to fabricate the panels, which adds time to the project. In addition, steel is more rigid and heavier than vinyl, meaning the crew must be more precise to avoid denting or bending the material. Cutting and installing steel trim and corners also takes longer than working with vinyl.

Contact Our Professional Siding Company in Kansas City

If you’re ready to replace your home’s siding and boost curb appeal and performance, partner with the specialists at Kent Mohler Exteriors. We offer high-quality products, personalized service, and flawless siding replacement in Kansas City, MO. Contact our experts today to schedule a consultation and request a quote for your project. We look forward to working with you!